Skip to main content

sbscafform

CASE STUDY

Compound Wall Construction
at VSI Naigaon

Executing 4.5 kilometers of Conventional RCC Compound Wall, ensuring maximum perimeter safety, durability, and a clean structural aesthetic.

Project & Technical Details

Project NameCompound Wall Construction
ClientSai Contractors & Engineers
LocationVSI Naigaon
Project TypeConventional RCC Compound Wall
Total Length4.5 KM
Wall Height2250 mm (2.25 mtr)
Wall Thickness150 mm
Column Width300 mm
Total Area201.75 sqm

Client Overview

Sai Contractors & Engineers is a reputed civil contracting firm engaged in executing infrastructure and construction projects with precision and efficiency. For their VSI Naigaon site, they required a durable and aesthetically aligned compound wall that ensured both security and structural integrity.

Challenges Addressed

Site Access & Logistics

Successfully managed logistical challenges during material delivery at the Naigaon site.

Time Efficiency & Workflow

Achieved rapid wall construction through systematic planning and deployment of skilled labor:

  • Shuttering managed by a dedicated team of 6 workers.
  • Casting handled efficiently by 8 workers.
  • Result: Consistently completed 17.5 meters of shuttering per day, ensuring strict adherence to project timelines.

Construction Methodology

1. Site Preparation

  • Clearing, leveling, and marking as per layout.
  • Excavation for column footings based on structural drawings.

2. Column Casting

  • Columns placed at regular intervals, ensuring 300 mm width for structural strength.
  • Reinforcement tied and formwork placed as per IS standards.

3. Wall Panel Installation

  • 150 mm thick RCC wall constructed using high-grade cement and aggregates.
  • Reinforcement provided to avoid cracks.
  • Panels anchored securely to handle wind load and soil pressure.

Project Gallery

Delivering Faster Construction Through Precision Engineering

SB Scafform Technovert Pvt. Ltd. | Formwork Solutions